Load Planning module

Plan spool loads on a board, not a whiteboard

Drag spools into truck loads, generate manifests, and watch each load move from Planned to Loading to In Transit to Delivered. The dispatcher’s view, finally digital.

  • Kanban lanes for Planned, Loading, In Transit, Delivered
  • Per-load mass, spool count, and manifest PDF
  • Live status pills with delivery timestamps
  • Per-spool drill-down to drawings and welds
Piping.Tools Load Planning workspace as a kanban board of truck loadsPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamLoad PlanningSearch load #, spool, manifest…Manifest PDFNew LoadPlanned3LD-0824.2 tSP-110-A · 12 spoolsLD-0836.8 tSP-114-B · 18 spoolsLD-0843.4 tSP-201 · 9 spoolsLoading2LD-0795.1 tSP-104-A · 14 spoolsLD-0807.2 tSP-108 · 21 spoolsIn transit2LD-0778.4 tSP-101-B · 26 spoolsLD-0784.6 tSP-103 · 11 spoolsDelivered3LD-0746.1 tSP-094-A · 17 spoolsLD-0755.3 tSP-095 · 13 spoolsLD-0764.0 tSP-096-B · 10 spools

Where the truck actually is

Each load shows where it sits on the workflow — Planned, Loading, In Transit, Delivered — and exposes the underlying spool list. The field gets a clean ETA; the shop sees what is leaving next.

Manifest in one click

A manifest PDF is generated automatically per load, with spool IDs, drawings, mass, and the destination. No more manual paperwork at dispatch.

What you get

Driver-friendly

Manifest PDF is print-ready for the driver and signature-ready for the receiving crew.

Field visibility

Construction sees what is on the way and when; dispatch sees what they have committed to.

Auditable

Every status change is logged with a timestamp and a user, so disputes are settled by the data.

Frequently asked questions

Can I integrate with our shipping system?

Manifest data can be exported and we are happy to discuss API integrations for organizations with an existing TMS or shipping platform.

How is load mass computed?

Load mass rolls up from the spool list using the BOM data on each drawing. You can override it per spool if your shop weighs differently.

Can I track partial deliveries?

Yes. A load can be split into multiple delivery records if the driver makes more than one stop, and each spool inherits its own delivery timestamp.