Progress module

A progress view that does not need a Monday-morning spreadsheet

WDI %, welds complete, open NDT, and schedule status — rolled up by area, system, and package, refreshed in real time as the project moves.

  • WDI %, welds complete, open NDT, schedule KPIs
  • Throughput trend over the last 7 / 14 / 30 days
  • Roll-up by area, system, drawing, or package
  • Export-ready PDF for the weekly report
Piping.Tools Progress workspace with KPIs and trend chartsPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamProgressFilter by drawing, area, system…Export PDFRefreshWELDS COMPLETE1,284+38 this weekWDI %78.6%+4.2%OPEN NDT46−12 vs last wkON SCHEDULE92%greenWeld throughput (last 14 days)WDI by drawing packageP-01P-02P-03P-04P-05P-06P-07AreaPlanned weldsComplete% DoneArea 100 — Inlet42038892%Area 200 — Reactor51040279%Area 300 — Utility28624485%Area 400 — Tankage19811659%

KPIs that come from the work

Every KPI on the dashboard is computed from the underlying weld log, NDT reports, and schedule. There is no separate progress sheet to keep in sync — the work is the progress data.

Drill-down where it matters

Spot a slipping area; click into it; see the specific drawings, welds, and NDT bottlenecks behind the number. Hand the same view to a foreman to fix it.

What you get

Weekly report

A one-click PDF export gives you the weekly progress report without the usual Monday rebuild.

Trend lines

Throughput trend over time tells you whether the curve is bending the right way.

Live, not nightly

Numbers update as welds and NDT reports are filed, not on an overnight batch.

Frequently asked questions

How is WDI calculated?

WDI is computed from the weld inch diameter completed against the planned weld inch diameter for the selected scope (drawing, area, system, or package).

Can I customize the KPIs?

The KPI strip and chart panels are configurable per project so the dashboard reflects what your team actually reports on weekly.

Does it integrate with our schedule?

Schedule milestones can be imported and linked to drawings or packages so the dashboard surfaces planned-vs-actual instead of just actuals.